Overview & Basic Info
Heating SystemDiesel, electric, gas, LPG
WarrantyFull System Warranty 1 Year
Weight500 to 5000 Kilograms
Voltage / Frequency440/380V/50Hz, 220V/60Hz, Customizable
Power ConsumptionTypical Range: 50-5000 Kw/H
CertificationsCE, ISO9001, SGS
Capacity100,000 ~ 2,000,000 Pieces / Year
HS Code8424899990
Product Description
Product Name: Enamel Production Line
Material Specs: Main frame uses Q235 section steel; key components use stainless steel (304/316); heating elements use heat-resistant alloys (SUS310s, GH1140, Inconel 601).
Customization: Tailored to fit buyer's specific requirements, including processing flow, dimensions, and capacity needs for workpieces like ovens, pots, and water heater tanks.
Packaging: Export-standard waterproof wooden boxes and iron packaging. Fragile components wrapped with foam and waterproof bags.
Product Advantages
1. Flexible Adaptability
Compatible with various workpiece dimensions and shapes (flat, cylindrical, irregular). Supports rapid transitions between different enamel formulas.
2. Industry-First Flexible Production
Simultaneously produce three product types and over ten models of water heater tanks (5L to 500L), reducing initial investment by over 50%.
3. 40% Energy Savings
Utilizes high-temperature insulation and proprietary waste heat recovery systems, reducing heat loss and energy consumption by 40%.
4. Advanced Separation Technology
Automatic oil-water separation reduces degreasing agent and rinse water usage by 50%, lowering production costs.
Key Features
Intelligent Monitoring
Real-time data display (conveyor speed, furnace temp, pressure) via PLC and touchscreen with automated alarms.
High Automation
Full-process automation including robotic loading, transfer, and unloading for "one-piece flow AI intelligent" production.
Excellent Enamel Quality
Precision temperature control (±3°C) guarantees uniform coating with impact resistance and adhesion ≥5N/cm (ASTM D3359).
Wide Applicability
Versatile coating for items ranging from medical device parts to large industrial chemical storage tanks.
Frequently Asked Questions
How long is the standard production lead time?
The production cycle typically ranges from 30 to 70 days, depending on specific customization requirements and the complexity of the coating line.
What information is needed for a customized quote?
Please provide workpiece type, dimensions (L×W×H), weight range, expected daily output, coating process requirements (liquid/powder/enamel), and available factory space.
How is equipment installation handled?
We provide turnkey installation and commissioning. Professional engineers will perform on-site setup and testing, usually taking 30-60 days.
What after-sales support do you offer?
We provide a 12-month warranty, free wearing parts (filters/nozzles), detailed maintenance manuals, remote technical troubleshooting within 2 hours, and on-site support if needed.
Does the system support energy recovery?
Yes, our furnaces use proprietary waste heat recovery systems for secondary utilization in ovens, achieving up to 40% energy savings.
Are the production lines automated?
Our lines feature full-process automation, including robotic loading, unloading, and AI-driven monitoring for unmanned or reduced-headcount production.