Elixir Logistics Elixir Logistics

Custom High Efficiency Automatic Paint Coating Production Line/Equipment with Oil-Water Separation Technology

Customization: Available
Application: Aerospace Industry, Appliance Industry, Automotive Industry, Construction Industry, Electronics Industry, Furniture Industry
Coating Type: Liquid Coating

Product Description

📊

Basic Specifications

Heating SystemDiesel, electric, gas, LPG
WarrantyOne-Year Warranty
Weight20-200 Tons (Customized)
Voltage/Frequency440/380V/50Hz, 220V/60Hz (Customizable)
Power Consumption100-1000 Kw/H Typical
CertificationsCE, ISO9001, SGS
MaterialQ235B / Stainless Steel / Alloy Steel
Capacity76 sets / Year
⚙️

Product Description

Automatic Paint Coating Production Line

Product Name: Automatic Spray Painting Line

This high-efficiency automatic coating system integrates advanced oil-water separation technology to provide superior surface finishing for metal, plastic, and wood workpieces. Designed for large-scale industrial applications, it ensures uniform coating thickness and energy-efficient operation.

Coating Equipment Overview
Spray Painting Detail
Industrial Coating Line
🚀

Key Advantages

Smart & Efficient Monitoring PLC and touchscreen integration allows real-time monitoring of conveyor speed, spray parameters, and curing oven status with automatic anomaly alarms.
Energy Saving Technology Utilizes patented exhaust heat recovery systems, reducing heat loss by 28% compared to conventional equipment through high-efficiency insulation.
Oil-Water Separation Automatic oil-water separation reduces degreaser and rinse water consumption by approximately 50%, significantly cutting chemical and wastewater costs.
Counter-Current Rinsing A mature counter-current design optimizes water usage, saving over 30% of rinse water in standard factory operations.

Technical Features

High Precision Automation Equipped with 6-axis painting robots and vision systems, achieving positioning accuracy of 0.1mm and coating thickness control within ±2µm.
Controlled Environment Maintains constant temperature (18-26°C) and humidity (45-75%) within the spray booth to ensure consistent finish quality.
Wide Compatibility Fully supports water-based, solvent-based, UV-cure, and 2K paints with a quick color change system (10-15 minutes).
Industrial Safety Includes explosion-proof motors, fire dampers, exhaust gas detectors, and safety light curtains in robot zones.
🏢

About Our Group

Founded in 2003, our group is a professional enterprise dedicated to the R&D, manufacturing, and service of high-end intelligent coating and spraying production lines. As a national high-tech enterprise, we hold over 100 patents and have established large-scale manufacturing bases to serve global industrial needs.

Manufacturing Base
Production Facility
Business Scope:
  • Complete Automatic Enamel Coating & Firing Equipment
  • Automatic Pre-surface Treatment Systems
  • Automatic Painting & Powder Coating Equipment
  • Robot Automation & Non-standard Equipment
  • Electrophoresis Coating Production Lines
🤝

Cooperative Customers

Global Partners

Frequently Asked Questions

1. What is the standard production lead time?
The standard production cycle is 30-70 days, depending on customization requirements like capacity and functional modules.
2. What information is needed for a customized quote?
Please provide the workpiece type, dimensions, weight, expected daily output, coating process requirements, and available factory space.
3. How is the equipment installation handled?
We provide turnkey installation and commissioning. Our engineers will visit your site for setup and testing, typically taking 30-60 days.
4. What kind of after-sales support do you provide?
We offer remote technical troubleshooting within 2 hours, on-site mechanical support within 5-10 working days, and a supply of spare parts.
5. What does the equipment warranty cover?
All systems come with a 12-month warranty from the date of commissioning, covering the repair or replacement of faulty components.
6. How is maintenance managed for international clients?
We provide a detailed maintenance manual, online staff training, and can ship essential consumables within 3-7 working days via international logistics.

Related Products